PABCD Initiative Documentation Hub pabcd_initiative codexclaw cli-jaw

Implementation Log (devlog) Routine — the documentation loop inside PABCD

Source: dev-scaffolding/references/implementation-log.md

Implementation Log (devlog) Routine — the documentation loop inside PABCD

Canonical spec for the per-implementation-unit documentation routine that rides the

PABCD cycle. Companion to dev-pabcd/SKILL.md §3.1 (numbering) and

dev-scaffolding/SKILL.md §2.1 (folder proposal rules). Read before any development

work: unit residence is universal (UNIT-RESIDENCE-01) — the full routine below is for

C2+/multi-phase work; C0-C1 leaves a numbered record doc (see the last section).

The unit: one implementation unit = one plan folder

devlog/
  _plan/
    YYMMDD_slug/          ← one implementation unit (not one issue, not one commit)
      00_plan.md          ← master plan: objective, constraints, work-phase map
      01_research_*.md    ← research/spec docs (00-09 range)
      10_phase1_*.md      ← phase 1 design at diff-level precision
      20_phase2_*.md      ← phase 2 ...
  _fin/                   ← completed units move here (closure record kept, not deleted)

Numbering: decade ranges separate concerns — 00-09 research/specs/MOC, 10-19

phase 1, 20-29 phase 2, and so on. Two-digit (00_, 10_) is the default; a repo

may standardize on three digits (000_, 010_) — pick ONE per repo and never mix.

Never bare semantic filenames (PLAN.md, RCA.md) — the numeric prefix is the

ordering and the audit trail.

How the routine rides PABCD (the loop)

PhaseDocumentation actionGate
PCONCRETIZE: write 00_plan.md (objective, measured baseline, dependency-ordered work-phase map, risks) + research docs 01+; decade docs for EVERY roadmap phase at diff-level precision (exact paths, NEW/MODIFY/DELETE, before/after for MODIFY) — DIFFLEVEL-ROADMAP-01plan exists as files, not chat
AAUDIT THE DOCS: an independent reviewer checks the plan docs — paths/signatures real, research coverage complete, phases sized, no ownership violations, no contradictions vs researchFAIL → fix docs → re-audit
BImplementation cites the doc it executes; deviations are edited back into the doc BEFORE coding past themdoc and code never diverge silently
CGate results (commands + tails) recorded into the unit; general SoT docs patched to match the change (SOT-SYNC-01 — recommend creating one if absent)evidence lives next to the plan
DAttestation/summary appended to 00_plan.md; on unit completion the folder moves _plan/_fin/durable closure record

Multi-cycle units: one full PABCD per work-phase; ALL phase design docs are written

to diff-level in the FIRST P (or the design-only Phase-0 pass) —

DIFFLEVEL-ROADMAP-01. P of each later cycle re-verifies its pre-written doc against

the current codebase (stale check) and amends it BEFORE building; it never writes

the doc fresh mid-unit. The attestation log in 00_plan.md is the continuity spine

— each new P quotes the previous D conclusion from it (see dev-pabcd §10

LOOP-CONTINUITY-01).

Mapping to mainstream developer practice (translation table)

This routine is NOT an issue tracker. Issues are the industry's unit of *tracking*

(small, cheap, closable); this is the industry's unit of *thinking* — the design-doc

lineage. Mature orgs run BOTH and link them. If a collaborator says "devlog isn't

standard", translate:

This routineMainstream equivalent
_plan/YYMMDD_slug/ unit folderDesign doc / RFC per feature (Google design docs, Rust RFCs, PEPs)
00-09 research docsRFC "Motivation / Prior art" sections
Diff-level phase docsDetailed design; kernel patch-series cover letter
A-phase doc auditDesign review / RFC final-comment-period — review BEFORE code
Evidence in C, attestation in DCI gate records + review sign-off
_fin/ closure recordShipped postmortem + changelog entry
Hard-to-reverse decisionsADR (see dev-scaffolding §2.1 — separate, immutable)
Issue/ticketStill useful: one issue per unit LINKING to the folder; sub-issues for tracking granularity

Two deliberate differences from common practice, kept on purpose:

  1. Diff-level precision in the plan — most design docs stop at architecture;

agents execute better from exact-path plans, and the A audit becomes mechanical.

  1. Docs gate execution (A before B) — in many teams design review is advisory;

here it is a hard gate because the executor (an agent) will otherwise

confidently build from a flawed plan.

Ceremony scales; residence does not

Every piece of work lands in an implementation unit (UNIT-RESIDENCE-01). The full

routine above (master plan + all-phase diff-level docs + doc audit) is mandatory for

C4, for any multi-phase unit regardless of class, and for C3 when state must persist

across turns/agents or contracts/architecture need a durable audit trail. C0-C1

fast-path work skips the ceremony but still leaves a numbered record doc in its

owning unit (what changed · why the fast path applied · verification evidence);

create a minimal unit folder if none exists. Over-documenting small work is process

slop — but "small" scales the ceremony down, never the record away.